Is your electricity meter burnt, stuck, running too fast or not showing any reading? Then you need a MEPCO meter change as soon as possible, because a faulty meter can lead to wrong bills, average billing or even a detection charge later. This guide explains when to request a new meter, how to apply online or at the office, what NEPRA’s rules say about replacement time and cost, and how to make sure your first bill after the meter change is correct.

When Do You Need a MEPCO Meter Change?

Request a MEPCO meter change in any of these situations:

  • Burnt or damaged meter: Burn marks, melted casing or a smell of burning
  • Stuck meter: The reading does not move even when appliances are running
  • Slow or fast meter: Units do not match your actual use
  • Blank or faulty display: You cannot read the meter at all
  • Broken glass or seal: Physical damage that could later be treated as tampering
  • Load upgrade: You need a three-phase or TOU meter after increasing your sanctioned load
  • Solar connection: A two-way (bidirectional) meter is needed for a solar system connected to the grid

Report the problem yourself. If you wait until MEPCO finds it during an inspection, you may face a detection bill.

How to Apply for a MEPCO Meter Change

Option 1: MEPCO SMART app

The official MEPCO SMART app, listed on the MEPCO website, includes a Meter Change Request option to request replacement of a damaged meter. Keep your 14-digit reference number ready, submit the request and save the request or tracking ID.

Option 2: Sub-division office or customer service centre

  1. Visit the sub-division office named on your bill.
  2. Submit a written application for meter change with your reference number.
  3. Attach a copy of the latest bill, your CNIC and photos of the faulty meter.
  4. Ask for an acknowledgement with a date.
  5. Follow up until the new meter is installed.

Option 3: Helpline 118

For a burnt meter or sparking, call 118 first for safety, then follow up with a written request. Our MEPCO complaint number guide lists every contact channel.

How to apply for MEPCO meter change steps
Simple steps to request a new MEPCO meter.

How Long Should a MEPCO Meter Change Take?

Under NEPRA’s Consumer Service Manual billing complaint rules, a defective meter should be replaced as soon as possible and within a maximum of two billing cycles. NEPRA has also limited supplementary bills for slow meters to two billing cycles and said officials who fail to flag slow meters can face disciplinary action. If your request stays pending longer, escalate it with your application date and complaint ID.

MEPCO new meter key facts table
Everything to know before your MEPCO meter change.

MEPCO Meter Price and Who Pays

MEPCO does not publish a single public price list for meters online, and the cost depends on the meter type, such as single-phase, three-phase, TOU or bidirectional. In practice:

  • Defective meter (no fault of the consumer): Ask your SDO in writing whether any cost applies. A meter that fails on its own is generally the company’s responsibility to replace.
  • Damaged by the consumer: If a meter is burnt because of overload or damaged by the consumer, the office may charge the cost.
  • Load upgrade or new meter type: When you ask for a three-phase, TOU or bidirectional meter, the cost is usually shown in a demand notice that you pay at the bank.

Whatever the case, any MEPCO meter price or charge should come through an official demand notice or your bill. Never pay cash to an individual for a “fast” meter.

Single-Phase, Three-Phase, TOU and Green Meters

Meter typeTypical useNotes
Single-phaseMost homes with small loadsStandard domestic connection
Three-phaseLarger homes, shops, motorsNeeded when load is high or for three-phase appliances
TOU meterLoads of 5 kW and aboveRecords peak and off-peak units separately
Bidirectional (“green”) meterSolar systems connected to the gridMeasures import and export of units

If your new meter is a TOU meter, your bill will show separate peak and off-peak units. Read our MEPCO peak hours guide to plan your usage.

What to Do on the Day of the Meter Change

  1. Photograph the old meter showing the final reading and meter number.
  2. Photograph the new meter showing its starting reading and meter number.
  3. Check the seals on the new meter and note them in your photos.
  4. Ask the staff to record both readings on the meter change form, and request a copy if possible.
  5. Keep all photos until two bills after the change have been checked.

These photos protect you if the old meter’s final reading is entered wrongly.

MEPCO meter change day checklist
Protect yourself from wrong readings after a meter change.

Checking Your First Bill After a MEPCO Meter Change

The first bill after a new meter often has two parts: the final units of the old meter and the starting units of the new one. Check that:

  • The old meter’s final reading matches your photo
  • The new meter’s starting reading matches your photo
  • The total units are the sum of both parts
  • No average or detection charge has been added without explanation

If something does not match, use our MEPCO bill correction guide to fix it quickly.

Smart Meters in MEPCO

According to Business Recorder, MEPCO is focusing on grid modernisation through Advanced Metering Infrastructure (AMI) and digital billing. Smart meters can send readings automatically, which reduces reading errors and estimated bills. If MEPCO installs a smart meter at your home, keep a photo of the old meter’s final reading just as you would for any other meter change.

Common Problems and Solutions

New meter not installed for weeks: Follow up with your application date. After two billing cycles, escalate to NEPRA with your complaint ID.

Average bill while waiting for a new meter: Ask MEPCO to adjust the average against actual units once the new meter is installed.

Bill shows a high reading after the change: Compare it with your photos and request a correction.

Office asks for cash: Ask for an official demand notice instead. Pay only at the bank or through official channels.

Meter Change With a Load Extension

Many families ask for a new meter after adding air conditioners, an electric geyser or a water motor. In that case, you usually need a load extension as well as a MEPCO meter change. The official MEPCO SMART app has a Change of Attributes option for requests like a change of load, tariff or owner name. Once the new load is approved, MEPCO may issue a demand notice for any meter or cable cost, and then install a meter that matches the new load.

Keep in mind that a higher sanctioned load also means higher fixed charges under the 2026 tariff, and a load of 5 kW or more puts residential consumers on a TOU meter. Ask for only the load you really need.

Where to Read the Official Rules

  • NEPRA publishes the Consumer Service Manual and its decisions on NEPRA’s website. These rules cover meter replacement time, billing complaints and detection limits.
  • MEPCO’s own services, including the MEPCO SMART app and customer care contacts, are listed on the official MEPCO website.
  • For news on MEPCO’s move to smart metering, see Business Recorder’s report on MEPCO and other distribution companies.

Tips for a Smooth MEPCO New Meter Installation

  • Keep the meter area clean and accessible so staff can work safely
  • Make sure your internal wiring and main switch are in good condition before the new meter is fitted
  • Be present during installation, or ask a family member to be there with your photos
  • Ask the staff to show you how to read the new meter’s display, especially on TOU and digital meters
  • Save the meter number of your new meter in your phone along with the reference number

Quick Summary: MEPCO Meter Change

  • Request a MEPCO meter change as soon as your meter is burnt, stuck, slow or unreadable.
  • Apply through the MEPCO SMART app’s Meter Change Request option or at your sub-division office.
  • NEPRA rules require a defective meter to be replaced within two billing cycles.
  • Any MEPCO meter price or cost should appear on an official demand notice or bill, never as cash.
  • Photograph the old and the MEPCO new meter readings on the day of the change.

Frequently Asked Questions

How do I apply for a MEPCO meter change?

Use the Meter Change Request option in the MEPCO SMART app or submit a written application at your sub-division office with your bill, CNIC and meter photos.

How long does MEPCO take to change a faulty meter?

NEPRA’s rules say a defective meter should be replaced as soon as possible and within two billing cycles.

What is the MEPCO meter price?

There is no single public price list. The cost depends on the meter type and is shown on an official demand notice when a charge applies.

Will I get an average bill until the new meter is installed?

Possibly. Once the new meter is installed, ask MEPCO to adjust any average against actual consumption.

Do I need a new meter for solar?

Yes. A grid-connected solar system needs a two-way meter that records units imported and exported.

Similar Posts

2 Comments

Leave a Reply

Your email address will not be published. Required fields are marked *