Electricity meter price in Pakistan 2026

Electricity Meter Price in Pakistan 2026: Single Phase, Three Phase & Smart (AMI) Meter Costs

Planning a new connection, a load increase or a meter replacement? One of the first questions is the electricity meter price in Pakistan. Unlike most products, you do not buy an official meter from a shop; the distribution company supplies it and charges you through a demand notice. This guide explains the single phase meter price, the three phase meter price and smart (AMI) meter charges, using official published examples, and what MEPCO consumers should expect.

Why People Search for Meter Prices

Families building a new house, landlords splitting a building into portions, shopkeepers opening a new outlet and farmers installing tube wells all need to budget for a meter. Searching for the electricity meter price in Pakistan often gives confusing answers because shop prices for private sub-meters are mixed with official connection charges. This guide separates the two so you know what to expect from MEPCO and what is a private purchase.

How Meter Costs Work in Pakistan

When you apply for a new connection or a meter change, the distribution company (MEPCO in South Punjab) checks your load and site, then issues a demand notice. This notice lists the charges you must pay at the bank, which can include:

  • The meter itself
  • Service cable from the pole to your meter
  • Security deposit based on load
  • Other connection charges

The demand notice is the final word on what you pay. Do not pay agents or staff in cash for meters. Our MEPCO demand notice guide explains how to read and pay it.

Official Example: IESCO Meter Charges 2026

MEPCO consumers often ask for exact figures. Each company publishes its own schedule, but IESCO’s published lump-sum tables, as reported by Pakistan Era in October 2026, give a useful example of how charges are structured:

Meter typeService lineCharge
Single phaseUp to 20 mRs 8,500
Single phaseUp to 30 mRs 10,500
Single phaseUp to 40 mRs 11,500
Three phaseUp to 20 mRs 36,500
Three phaseUp to 30 mRs 43,000
Three phaseUp to 40 mRs 50,000
AMI single phaseUp to 20 mRs 35,000
AMI three phaseUp to 20 mRs 65,000
Three phase meter price examples
IESCO lump-sum tables as reported in October 2026; MEPCO charges may differ.

These are IESCO figures, not MEPCO’s. MEPCO’s charges may be different, so always rely on the demand notice for your connection.

Single Phase Meter Price

Most homes with a sanctioned load of up to about 5 kW use a single-phase connection. Based on the IESCO example above, a standard single phase meter with a short service cable was charged at around Rs 8,500 to Rs 11,500, while a smart AMI single-phase meter with cable was around Rs 35,000 to Rs 38,000. The single phase meter price you pay depends on the meter type MEPCO installs and the cable length to your house.

Three Phase Meter Price

Larger homes, shops, workshops and tube wells with higher loads usually need a three-phase connection. In the IESCO example, the three phase meter price with service cable ranged from Rs 36,500 to Rs 50,000 for standard meters and from about Rs 65,000 upward for AMI three-phase meters, depending on cable length and size. If you plan to add ACs or solar, a three-phase connection may be needed; see our MEPCO load extension guide.

Single phase meter price payment steps
Meter charges come through the official demand notice.

Single Phase or Three Phase: Which Do You Need?

PointSingle phaseThree phase
Typical loadUp to about 5 kWAbove about 5 kW
Typical usersMost homes and small shopsLarge homes, shops, workshops, tube wells
Meter costLowerHigher
HandlesFans, lights, 1 to 2 ACsSeveral ACs, motors, larger solar

If your sanctioned load is close to the single-phase limit and you plan to add more ACs or a larger solar system, it may be better to apply for three-phase from the start rather than paying for changes later. The three phase meter price is higher, but it avoids overloading and frequent tripping.

What Else Is on the Demand Notice?

The meter is only one item. A new connection demand notice can also include the service cable, the security deposit for your load and other connection charges. That is why the total can be much higher than the electricity meter price in Pakistan alone. Ask the sub-division office to explain each line before you pay, and keep a copy of the paid challan with your property documents. Our MEPCO new connection guide lists the documents you need.

Smart Meter Prices for Distribution Companies

In December 2025 the federal power minister announced lower smart meter prices for distribution companies. According to Pakistan Observer, the three-phase smart meter price fell from about Rs 45,000 to Rs 25,000, excluding taxes, and the single-phase smart meter price was cut by about Rs 7,000. These are procurement prices for companies, not the amount charged on every consumer’s demand notice, which also includes cable and other materials. Learn more in our AMI meter guide.

Green (Bidirectional) Meter for Solar

Solar users on net billing need a bidirectional meter. Under NEPRA’s 2026 rules, the prosumer pays interconnection costs, including the meter, plus a Rs 1,000 per kW concurrence fee. Read our MEPCO green meter guide for details.

Why Meter Prices Rose in Recent Years

Meter and cable prices depend on copper, electronics and the exchange rate. As the rupee weakened and copper prices rose, the cost of meters and service cables increased. Smart meters add communication modules, which cost more. The government’s December 2025 announcement of lower smart meter procurement prices was meant to speed up the switch to AMI meters while controlling costs. For consumers, the main point is simple: the single phase meter price and three phase meter price you pay are set by the company’s schedule and shown on the demand notice.

Sub-Meters for Tenants and Portions

Some landlords install private sub-meters to split one connection between portions. These are bought from the market and are not official MEPCO meters. MEPCO bills only the main meter, so sub-meter readings are a private arrangement between landlord and tenants. If each portion needs separate billing, apply for separate connections instead.

Meter Change and Replacement

If your meter is faulty, burnt or damaged, apply for a meter change at your sub-division office or through the MEPCO app. Charges depend on the reason: replacement of a faulty meter may be handled differently from damage caused by the consumer. See our MEPCO meter change guide for the process.

Meter Charges for Tube Wells and Shops

Agricultural tube wells and many shops need three-phase connections because motors and compressors draw high load. For these users, the three phase meter price is only part of the cost; longer service lines from the pole, transformers in remote areas and higher security deposits can add significantly to the demand notice. Farmers should check the agricultural tariff and fixed charges in our MEPCO tube well bill guide, and shopkeepers should read our MEPCO commercial unit price guide before applying.

How Long Does Meter Installation Take?

After you pay the demand notice, MEPCO schedules installation according to material availability and its work queue. Track your application through the official new connection system or the MEPCO app. If installation is delayed for a long time, contact your sub-division office with the paid challan, or register a complaint through helpline 118 or the CCMS portal. Our MEPCO complaint number guide lists every channel.

Avoid Meter Scams

Electricity meter price in Pakistan scam tips
Protect yourself when getting a new meter.
  • Pay meter charges only through the official demand notice at a bank.
  • Never pay cash to agents or staff promising a “fast meter”.
  • Do not buy an official meter from a private shop; MEPCO supplies and seals meters.
  • Keep every receipt until the meter is installed and the first bill arrives.
  • Report bribe demands to MEPCO through official channels.

Quick Summary: Electricity Meter Price in Pakistan

  • Official meters are supplied by the distribution company and charged through the demand notice.
  • IESCO’s 2026 example: single phase about Rs 8,500 to Rs 11,500 and three phase about Rs 36,500 to Rs 50,000 with cable.
  • Smart AMI meters cost more, from about Rs 35,000 single phase and Rs 65,000 three phase in that example.
  • MEPCO charges may differ; your demand notice is final.

Frequently Asked Questions

What is the electricity meter price in Pakistan?

It depends on the meter type and cable length. In IESCO’s 2026 example, a single-phase connection was about Rs 8,500 to Rs 11,500 and a three-phase connection about Rs 36,500 to Rs 50,000.

What is the single phase meter price for MEPCO?

MEPCO charges through the demand notice for your connection. Check the notice for the exact amount.

What is the three phase meter price?

In IESCO’s example, standard three-phase meters with cable cost about Rs 36,500 to Rs 50,000, and AMI three-phase meters from about Rs 65,000.

Can I buy my own electricity meter?

Not for an official connection. MEPCO supplies, installs and seals the meter.

Is a smart meter more expensive?

Yes. AMI smart meters cost more than standard meters because of communication features and materials.